Technical Support

A full-spectrum support service from an expert team

GPTECH’s experienced engineering team supports the whole equipment lifecycle — selection, installation, commissioning and service —
keeping your units reliable and your production efficient.

  • Expert TeamSenior engineers, 24/7 online
  • Fast ResponseReply in 2 h, on site within 48 h
  • Full CoverOEM spares, 12-month warranty
  • Knowledge SharingFull documentation, regular training

Service & Support

Model Selection

Based on your process

Expert selection advice

and scheme design

Installation Guidance

Installation manuals provided

Remote or on-site

implementation support

Commissioning

Commissioning and parameter setup

Ensuring peak performance

and stable operation

Operator Training

Operator training delivered

Helping your team get up to speed

with the equipment

Maintenance

Scheduled maintenance advice

Extending service life

and reducing downtime

After-Sales

24/7 technical support

Fast response to your needs

protecting production continuity

  • The TLS series pairs a PLC controller with an intelligent PID module, achieving ±0.1℃ control accuracy and 0.01℃ display resolution over a 5–85℃ range. A 7-inch colour touchscreen displays and logs temperature curves and test data as standard.

  • Four parameters drive selection: the temperature range your process needs; the actual heat load (cooling capacity); the required circulation flow and head; and the condensing method (air or water) together with site power. Catalogue capacities assume 20℃ cooling-water inlet and 20℃ ambient for air-cooled units — allow a 10–20% margin in practice. Send us your process conditions and our engineers will size it with you.

  • Air-cooled units need clear intake and discharge space to prevent hot-air recirculation. For water-cooled units the cooling-water inlet must stay between 5℃ and 33℃ (30℃ for low-temperature models) at 2–4.5 bar. Insulate pipework to avoid condensation. Provide the rated supply with proper earthing, and confirm phase sequence on three-phase units.

  • The unit shows its status in real time and diagnoses faults automatically. The touchscreen names the specific alarm — high or low refrigerant pressure, pump overload, compressor overload, sensor fault and so on. Record the code and site conditions, rule out external causes (water cut-off, blocked airflow, supply voltage) and reset. If the alarm repeats, contact our engineers.

  • Monthly: check and clean the condenser fins. Quarterly: check heat-transfer fluid level and condition, inspect pipework for leaks and listen to the pump. Annually: a full inspection covering refrigerant pressure, electrical terminal tightness and sensor calibration. On low-temperature units, keep the expansion tank level between 1/4 and 2/3 of the sight glass as the manual specifies.

Service Process

  1. Enquiry

    Understand your requirement

    Outline a first approach

    01
  2. Proposal

    Prepare the technical scheme

    Confirm equipment selection

    02
  3. Order Confirmation

    Agree scheme and contract

    Schedule production

    03
  4. Manufacture & Delivery

    Controlled manufacturing

    Full factory testing

    04
  5. Installation

    Installation guidance

    On-site commissioning

    05
  6. Ongoing Support

    Continuous technical support

    Keeping the unit reliable

    06

Need technical support?
Our specialists are ready to help